Tuesday
Aug172010
2nd Floor Beam is in.
Tuesday, August 17, 2010 at 09:08PM We are over another small mountain today because of our large beam is in. It is a 21ft long over 2ft high 7in wide slab of wood. It took a crane to get it in place. This beam will be the primary support for the secound story addition and the entilre roof. The floor joists are going in very fast and if we keep it up the whole addition should be closed in very soon. If it stops raining. It is suppose to rain every day for a whole week.



Reader Comments